A kitchen makeover influences nearly every aspect of living at home, whether it’s enjoying morning coffee or having family dinners on the weekend.
Since the kitchen is generally one of the liveliest places in a home, doing the demolition part without planning can very well lead to you either using up your budget very fast or your work getting stuck only about halfway through. If you make a clear kitchen renovation checklist, your decision will be very well organized, prevent expensive changes later, and give the homeowner an idea of the few weeks ahead, realistic in terms of time and costs.
This article helps you with the step-by-step kitchen renovation planning which is very easy if you know where to start: from budgeting to getting the right hands for building, we have it covered. The main objective is to make the process as stress-free as possible rather than something that would overwhelm you.
According to data from the National Kitchen and Bath Association, unplanned kitchen projects tend to get out of hand both in time and budget compared to those that begin with a written scope of work. A checklist really pushes three key elements to the top: budgeting, making a floorplan drawing, and making a schedule that is both flexible and firm. If any of these are neglected, one way or the other, it will appear as delayed finish, mismatched finishes, or a complete surprise on the bill after the walls are opened.
When a plan is written down, it also helps to understand different quotes from remodeling companies against the same list of materials and work.
Many homeowners prefer to divide their kitchen remodeling budget into categories to get a better picture before settling on a single lump sum. Nationally, the kitchen renovation prices for a moderate kitchen fall usually between $25, 000 and $50, 000, still, these are just guidelines the expenses actually fluctuate depending on the regional, the size of the kitchen and the choice of materials.
Budget Category | Typical Share of Total Cost |
Cabinetry | 29% |
Labor and Installation | 17% |
Countertops | 10% |
Appliances | 14% |
Flooring | 7% |
Lighting and Fixtures | 5% |
Design Fees | 4% |
Contingency Fund | 10-15% |
Actually, the last one was the most important. It means that a reserve fund of 10 to 15 percent would be good for unexpected expenses like old wiring, water damage, or subfloor repairs which only appear when cabinets and floors are taken off.
The decisions on the floor plan should be made long before the discussion on colors, wallpapers, and so on. One may say the kitchen layout should have the same elements as a typical work triangle: the sink, the fridge, and the cooker even if there are only one room walls between those appliances.
Some simple work triangle rules that could be remembered:
It would be wise if homeowners were to do some trial runs with painter’s tape before placing their cabinet order, especially if they are adding an island or a larger refrigerator.
This is because cabinetry changes mid-project could be very costly to make. They might need the help of a cabinet maker to do it right.
Material selection is where budgets are won or lost. Comparing options side by side helps avoid choosing a finish that looks good in a showroom but performs poorly in daily use.
Countertop Material | Avg. Cost / Sq. Ft. | Durability | Maintenance |
Laminate | $20-$50 | Moderate | Low |
Quartz | $50-$100 | High | Low |
Granite | $40-$100 | High | Moderate |
Butcher Block | $35-$70 | Moderate | High |
Marble | $60-$150 | Moderate | High |
Cabinetry follows a similar logic. Stock cabinets keep costs down and shorten lead times, semi-custom cabinets offer more sizing flexibility, and fully custom cabinetry gives the most design control but adds several weeks to the timeline.
The owner of a home, on the other hand, should at the very least be given a written quote, the proof of licensed, and up-to-date insurance documents prior a homeowner to sign a work permit. Also, don’t hesitate to inquiry about the way that the company deals with amendments. This, in one respect, is a very good reason, as policies being vague lead to many billing disagreements.
The following is the list of inquiries you could make when hiring a contractor:
Read More: Complete Kitchen Remodeling Guide
Most kitchen remodels move through recognizable phases. Material lead times, particularly for custom cabinetry and special-order countertops, are usually the longest part of the schedule, not the construction itself.
Phase | Estimated Duration |
Design and Material Selection | 2-4 weeks |
Permitting (if required) | 1-3 weeks |
Demolition | 2-5 days |
Plumbing and Electrical Rough-In | 3-5 days |
Cabinet and Countertop Installation | 1-2 weeks |
Flooring, Painting, and Fixtures | 1 week |
Final Walkthrough | 1-2 days |
Ordering cabinets and countertops early, often before demolition starts, is one of the most effective ways to keep the overall project on schedule.
Kitchen remodeling to-do list helps the owner minimize a number of unpleasant situations since every old home tends to show something once walls are removed. Still, it doesn’t make sure the homeowner will control all the situations. It just gives him/her a chance to make decisions regarding the budget, location, and the timeline that are, indeed, very essential. Getting ready for the remodel at every step will make your home improvement project with a company you have selected like Columbus Kitchen & Bath much smoother from the initial design to when the work is done.
The cost of the mid-range kitchen remodeling will be between $25,000 - $50,000 while smaller or larger projects (e.g. complete kitchen overhaul) might be even beyond that price because of space size and material choice.
Demotion, remodeling, and final inspection usually take 4-8 weeks, with a few extra weeks to be added for ordering materials and design.
If your renovations include such works as moving plumbing, electrical, or gas lines, structural changes, etc., most likely, you will need to get permits. Minor changes such as repaint or replacing cabinet front won't usually require one, although the local regulations may vary.
Stock cabinets are suitable for regular kitchen layouts and limited budget. Semi-custom cabinets are able to provide more options, especially in case of irregular sizes. Custom cabinets are ideal in the circumstances when homeowners want maximum design control at their expense of speed.
Custom cabinetmaking and countertop ordering (special-order) lead times will result in more delays than actual construction. Early purchasing will definitely help you prevent running short on time.